WHAT SUNBELT CONTROLS DELIVERED

ACCO started work on the Chukchansi Casino in late December of 2002 and it opened its doors, on schedule, on June 25, 2003. The main casino area is conditioned with 37 packaged A/C units with heatwheels. PTAC (packaged terminal air conditioning) units serve the hotel rooms. These are vertical heat pumps. The direct digital control system was designed, furnished, and installed by the Sunbelt Controls and are fully integrated with the package units. TAC is the hardware platform used for the control’s system.

PROJECT TEAM

OWNER: Chukchansi Economic Development Agency
(C.E.D.A.) MECHANICAL ENGINEER: AE Associates
MECHANICAL CONTRACTOR: ACCO Engineered Systems
CONTROLS CONTRACTOR: Sunbelt Controls